Multi-Criteria Decision Analysis

Multi-criteria decision analysis is a technique that uses a decision matrix to provide a systematic approach for evaluating candidates or options against a set of weighted criteria to make objective selection decisions.

Share:

Know it well enough for the exam? Questions on Multi-Criteria Decision Analysis are scenario-based, not definitional.

Practice it free

Explanation

Multi-criteria decision analysis (MCDA) is used during the Acquire Resources process to objectively evaluate and select team members when multiple candidates are available. Selection criteria are developed and weighted based on their importance, and each candidate is scored against these criteria. The weighted scores are totaled to identify the best-fit candidate.\n\nCommon criteria used for team resource selection include availability, cost, experience, ability (competency), knowledge, skills, attitude, and international factors such as location or language. The weighting reflects the project priorities — for example, a technically complex project might weight experience and ability more heavily, while a time-constrained project might prioritize availability.\n\nMCDA helps remove bias from resource selection decisions by making the evaluation transparent and consistent. It provides a documented rationale for selection decisions, which can be valuable if decisions are questioned later. This technique is also used in other project management processes, such as source selection in procurement.

Key Points

  • •Uses a weighted scoring matrix for objective decision-making
  • •Common criteria: availability, cost, experience, skills, attitude
  • •Removes bias by making evaluation transparent and consistent
  • •Tool and technique of the Acquire Resources process

Exam Tip

Multi-criteria decision analysis helps select the best resource objectively. It is also used in procurement for source selection. Know that criteria are weighted by importance.

Frequently Asked Questions

Related Topics

High-yield topics our learners drill most before exam day.

Burndown Chart

A burndown chart plots the work remaining (usually in story points) against time in a sprint or release, alongside an ideal line to zero, so the team can see each day whether it is on track to finish.

Burn-Up Chart

A burn-up chart plots completed work rising over time against a separate total-scope line, so progress and scope changes are visible independently; the work is finished when the two lines meet.

Resource Leveling

Resource leveling is a resource optimization technique that adjusts activity start and finish dates so that demand for a resource never exceeds its availability, accepting a longer schedule and a changed critical path if necessary.

Deliverables

A deliverable is any unique and verifiable product, result, or capability to perform a service that must be produced to complete a process, phase, or project, such as a software release, an audit report, or a trained support team.

Power Interest Grid (Power/Influence Grid)

The power interest grid is a 2x2 stakeholder mapping tool that plots each stakeholder by power (ability to affect the project) and interest (concern about its outcome) to decide how to engage them: manage closely, keep satisfied, keep informed, or monitor.

Critical Path Method (CPM)

The Critical Path Method (CPM) is a schedule network analysis technique that calculates early and late start and finish dates for every activity to find the longest path through the project, the minimum project duration, and the float on every other path.

Weighted Shortest Job First (WSJF)

Weighted Shortest Job First (WSJF) is a prioritization model, popularized by SAFe, that ranks work by cost of delay divided by job duration (usually estimated as job size), so the items that lose the most value per unit of time spent waiting are done first.

Risk Register

The risk register is a project document that records the details of individual project risks, including their identification, analysis results, response plans, and current status.

Stakeholder Mapping

Stakeholder mapping is the visual representation of stakeholder relationships, influence, interest, or other attributes using grids, matrices, or diagrams to support analysis and engagement planning.

Part of

Resource Management

Study full domain →

Practice Multi-Criteria Decision Analysis

Scenario-based questions with a full explanation on every answer — including why the distractors are wrong.