Executing Process Group

Foundational concept

Not named in the current ECO. Still worth knowing — it underpins the situational questions and PMI's own experience verification uses the process groups.

The Executing Process Group consists of processes performed to complete the work defined in the project management plan to satisfy project requirements.

Share:

Know it well enough for the exam? Questions on Executing Process Group are scenario-based, not definitional.

Practice it free

Explanation

The Executing Process Group is where the majority of the project budget is spent and the majority of resources are engaged. This is where the team does the actual work of creating the project deliverables. Key processes include Direct and Manage Project Work, Manage Quality, Acquire Resources, Develop Team, Manage Team, Manage Communications, Implement Risk Responses, and Conduct Procurements.

During execution, the project manager spends most of their time leading the team, resolving issues, removing obstacles, and ensuring that work is being performed according to the project management plan. Leadership, communication, and conflict resolution skills are critical during this phase. The project manager also manages stakeholder engagement to maintain support and address concerns.

Execution generates work performance data — raw observations and measurements such as percent complete, actual costs, and actual durations. This data flows into the Monitoring and Controlling Process Group for analysis. Execution also produces deliverables, change requests, and updates to the project management plan and project documents.

Key Points

  • •Where the project team creates the deliverables
  • •Consumes the majority of the project budget and resources
  • •Produces work performance data, deliverables, and change requests
  • •Requires strong leadership, communication, and team management

Exam Tip

Most of the project manager's time during execution is spent communicating. PMI emphasizes that PMs spend approximately 90% of their time communicating. Questions about what a PM should do "most" during execution often point to communication.

Frequently Asked Questions

Related Topics

High-yield topics our learners drill most before exam day.

Deliverables

A deliverable is any unique and verifiable product, result, or capability to perform a service that must be produced to complete a process, phase, or project, such as a software release, an audit report, or a trained support team.

Predictive Life Cycle (Waterfall)

A predictive life cycle is a plan-driven approach where the project scope, schedule, and cost are determined early and changes are carefully managed.

Subsidiary Plans

Subsidiary plans are the individual management plans that are components of the overall project management plan, each addressing a specific Knowledge Area or management function.

Burndown Chart

A burndown chart plots the work remaining (usually in story points) against time in a sprint or release, alongside an ideal line to zero, so the team can see each day whether it is on track to finish.

Burn-Up Chart

A burn-up chart plots completed work rising over time against a separate total-scope line, so progress and scope changes are visible independently; the work is finished when the two lines meet.

Resource Leveling

Resource leveling is a resource optimization technique that adjusts activity start and finish dates so that demand for a resource never exceeds its availability, accepting a longer schedule and a changed critical path if necessary.

Power Interest Grid (Power/Influence Grid)

The power interest grid is a 2x2 stakeholder mapping tool that plots each stakeholder by power (ability to affect the project) and interest (concern about its outcome) to decide how to engage them: manage closely, keep satisfied, keep informed, or monitor.

Critical Path Method (CPM)

The Critical Path Method (CPM) is a schedule network analysis technique that calculates early and late start and finish dates for every activity to find the longest path through the project, the minimum project duration, and the float on every other path.

Weighted Shortest Job First (WSJF)

Weighted Shortest Job First (WSJF) is a prioritization model, popularized by SAFe, that ranks work by cost of delay divided by job duration (usually estimated as job size), so the items that lose the most value per unit of time spent waiting are done first.

Part of

PM Fundamentals & Frameworks

Study full domain →

Practice Executing Process Group

Scenario-based questions with a full explanation on every answer — including why the distractors are wrong.