Closing Process Group

Foundational concept

Not named in the current ECO. Still worth knowing — it underpins the situational questions and PMI's own experience verification uses the process groups.

The Closing Process Group consists of processes performed to formally complete or close the project, phase, or contract.

Share:

Know it well enough for the exam? Questions on Closing Process Group are scenario-based, not definitional.

Practice it free

Explanation

The Closing Process Group ensures that all project work is finished, deliverables are accepted, resources are released, and the project is formally closed. In the PMBOK Guide Sixth Edition, this group contains a single process: Close Project or Phase. Despite having only one process, closing involves significant activities including final deliverable handoff, lessons learned documentation, contract closure, resource release, and archiving project records.

Lessons learned are particularly important during closing. PMI emphasizes capturing what went well, what could be improved, and what was learned throughout the project. These lessons become organizational process assets that benefit future projects. Unfortunately, lessons learned are often neglected due to time pressure or the team's eagerness to move on to the next assignment.

Closing also involves administrative activities such as obtaining formal sign-off from the customer or sponsor that the deliverables meet acceptance criteria, ensuring all financial accounts are reconciled, and updating organizational records. Premature closure — ending a project without proper closing activities — can lead to unresolved issues, lost knowledge, and contractual disputes.

Key Points

  • •Formally completes the project, phase, or contract
  • •Includes deliverable acceptance, lessons learned, and resource release
  • •Archives project records as organizational process assets
  • •A project can be closed whether completed successfully or terminated early

Exam Tip

Projects that are cancelled or terminated still go through the Closing Process Group. The exam may present a scenario where a project is ended early and ask what should happen next — the answer is to perform closing activities.

Frequently Asked Questions

Related Topics

High-yield topics our learners drill most before exam day.

Deliverables

A deliverable is any unique and verifiable product, result, or capability to perform a service that must be produced to complete a process, phase, or project, such as a software release, an audit report, or a trained support team.

Predictive Life Cycle (Waterfall)

A predictive life cycle is a plan-driven approach where the project scope, schedule, and cost are determined early and changes are carefully managed.

Subsidiary Plans

Subsidiary plans are the individual management plans that are components of the overall project management plan, each addressing a specific Knowledge Area or management function.

Burndown Chart

A burndown chart plots the work remaining (usually in story points) against time in a sprint or release, alongside an ideal line to zero, so the team can see each day whether it is on track to finish.

Burn-Up Chart

A burn-up chart plots completed work rising over time against a separate total-scope line, so progress and scope changes are visible independently; the work is finished when the two lines meet.

Resource Leveling

Resource leveling is a resource optimization technique that adjusts activity start and finish dates so that demand for a resource never exceeds its availability, accepting a longer schedule and a changed critical path if necessary.

Power Interest Grid (Power/Influence Grid)

The power interest grid is a 2x2 stakeholder mapping tool that plots each stakeholder by power (ability to affect the project) and interest (concern about its outcome) to decide how to engage them: manage closely, keep satisfied, keep informed, or monitor.

Critical Path Method (CPM)

The Critical Path Method (CPM) is a schedule network analysis technique that calculates early and late start and finish dates for every activity to find the longest path through the project, the minimum project duration, and the float on every other path.

Weighted Shortest Job First (WSJF)

Weighted Shortest Job First (WSJF) is a prioritization model, popularized by SAFe, that ranks work by cost of delay divided by job duration (usually estimated as job size), so the items that lose the most value per unit of time spent waiting are done first.

Part of

PM Fundamentals & Frameworks

Study full domain →

Practice Closing Process Group

Scenario-based questions with a full explanation on every answer — including why the distractors are wrong.