Change Control Board (CCB)

A Change Control Board (CCB) is a formally chartered group responsible for reviewing, evaluating, approving, deferring, or rejecting changes to the project, and for recording and communicating those decisions.

Share:

Know it well enough for the exam? Questions on Change Control Board (CCB) are scenario-based, not definitional.

Practice it free

Explanation

The CCB plays a central role in the Perform Integrated Change Control process. It is composed of stakeholders — potentially including the project manager, sponsor, customers, subject matter experts, and functional managers — who have the authority and responsibility to make change decisions. The composition and authority level of the CCB are defined in the change management plan, which is a component of the project management plan.

When a change request is submitted, the CCB evaluates the impact on the project constraints (scope, schedule, cost, quality, resources, and risk) and determines whether the change should be approved, rejected, or deferred. The CCB also ensures that configuration management procedures are followed so that all approved changes are properly tracked and implemented.

Not all projects have a formal CCB. On smaller projects, the project manager and sponsor may fulfill the CCB function. Regardless of the structure, the important principle is that change decisions are made by authorized parties, documented in the change log, and communicated to all affected stakeholders.

Key Points

  • •Formally chartered group with authority to approve, reject, or defer change requests
  • •Composition and authority defined in the change management plan
  • •Evaluates changes holistically across all project constraints
  • •Not required on all projects — the function may be performed by the project manager and sponsor

Exam Tip

The CCB approves or rejects changes but does not implement them. Implementation happens through Direct and Manage Project Work after approval.

Frequently Asked Questions

Related Topics

High-yield topics our learners drill most before exam day.

Burndown Chart

A burndown chart plots the work remaining (usually in story points) against time in a sprint or release, alongside an ideal line to zero, so the team can see each day whether it is on track to finish.

Burn-Up Chart

A burn-up chart plots completed work rising over time against a separate total-scope line, so progress and scope changes are visible independently; the work is finished when the two lines meet.

Resource Leveling

Resource leveling is a resource optimization technique that adjusts activity start and finish dates so that demand for a resource never exceeds its availability, accepting a longer schedule and a changed critical path if necessary.

Deliverables

A deliverable is any unique and verifiable product, result, or capability to perform a service that must be produced to complete a process, phase, or project, such as a software release, an audit report, or a trained support team.

Power Interest Grid (Power/Influence Grid)

The power interest grid is a 2x2 stakeholder mapping tool that plots each stakeholder by power (ability to affect the project) and interest (concern about its outcome) to decide how to engage them: manage closely, keep satisfied, keep informed, or monitor.

Critical Path Method (CPM)

The Critical Path Method (CPM) is a schedule network analysis technique that calculates early and late start and finish dates for every activity to find the longest path through the project, the minimum project duration, and the float on every other path.

Weighted Shortest Job First (WSJF)

Weighted Shortest Job First (WSJF) is a prioritization model, popularized by SAFe, that ranks work by cost of delay divided by job duration (usually estimated as job size), so the items that lose the most value per unit of time spent waiting are done first.

Risk Register

The risk register is a project document that records the details of individual project risks, including their identification, analysis results, response plans, and current status.

Stakeholder Mapping

Stakeholder mapping is the visual representation of stakeholder relationships, influence, interest, or other attributes using grids, matrices, or diagrams to support analysis and engagement planning.

Part of

Integration Management

Study full domain →

Practice Change Control Board (CCB)

Scenario-based questions with a full explanation on every answer — including why the distractors are wrong.