Sprint Review
The Sprint Review is a Scrum event held at the end of the Sprint where the Scrum Team presents the Increment to stakeholders, gathers feedback, and collaborates on what to do next.
Know it well enough for the exam? Questions on Sprint Review are scenario-based, not definitional.
Practice it freeExplanation
The Sprint Review is an opportunity for the Scrum Team to inspect the outcome of the Sprint and determine future adaptations. The team demonstrates the work that was completed and discusses what went well, what problems were encountered, and how those problems were solved.
During the Sprint Review, the Product Owner explains which Product Backlog items have been completed and which have not. Stakeholders provide feedback on the Increment, and the entire group collaborates on the next steps. The Product Backlog may be adjusted based on this feedback, making the Sprint Review a key inspect-and-adapt event.
The Sprint Review is timeboxed to four hours for a one-month Sprint, and proportionally shorter for shorter Sprints. It is a working session, not a formal presentation or gate review. The informal nature encourages open dialogue and honest feedback from stakeholders.
Key Points
- •Held at the end of each Sprint to inspect the Increment
- •Stakeholders attend and provide feedback
- •The Product Backlog may be revised based on feedback
- •Timeboxed to four hours maximum for a one-month Sprint
Exam Tip
The Sprint Review is NOT a demo or sign-off meeting. It is an inspect-and-adapt session. The correct answer usually emphasizes collaboration and feedback over formal presentation.
Frequently Asked Questions
Related Topics
Sprint
A Sprint is a fixed-length timebox of one month or less in Scrum during which the team creates a usable, potentially releasable product Increment.
Increment
An Increment is a concrete stepping stone toward the Product Goal, where each Increment is additive to all prior Increments and must meet the Definition of Done to be considered complete.
Product Owner
The Product Owner is the Scrum accountability responsible for maximizing the value of the product by managing and ordering the Product Backlog, representing stakeholder needs, and ensuring the team builds the right thing.
Sprint Retrospective
The Sprint Retrospective is a Scrum event where the Scrum Team inspects how the last Sprint went with regard to people, relationships, processes, and tools, and creates a plan for improvements.
Most-studied PMP concepts
High-yield topics our learners drill most before exam day.
Burndown Chart
A burndown chart plots the work remaining (usually in story points) against time in a sprint or release, alongside an ideal line to zero, so the team can see each day whether it is on track to finish.
Burn-Up Chart
A burn-up chart plots completed work rising over time against a separate total-scope line, so progress and scope changes are visible independently; the work is finished when the two lines meet.
Weighted Shortest Job First (WSJF)
Weighted Shortest Job First (WSJF) is a prioritization model, popularized by SAFe, that ranks work by cost of delay divided by job duration (usually estimated as job size), so the items that lose the most value per unit of time spent waiting are done first.
Relative Estimation
Relative Estimation is an agile technique where work items are sized in comparison to each other rather than in absolute units like hours or days, providing faster and more accurate estimates.
Sprint Backlog
The Sprint Backlog is the set of Product Backlog items selected for the Sprint, plus the Sprint Goal and the plan for delivering the Increment.
Timeboxing
Timeboxing is the practice of allocating a fixed, maximum amount of time for an activity, after which the activity stops regardless of whether it is complete.
Resource Leveling
Resource leveling is a resource optimization technique that adjusts activity start and finish dates so that demand for a resource never exceeds its availability, accepting a longer schedule and a changed critical path if necessary.
Deliverables
A deliverable is any unique and verifiable product, result, or capability to perform a service that must be produced to complete a process, phase, or project, such as a software release, an audit report, or a trained support team.
Power Interest Grid (Power/Influence Grid)
The power interest grid is a 2x2 stakeholder mapping tool that plots each stakeholder by power (ability to affect the project) and interest (concern about its outcome) to decide how to engage them: manage closely, keep satisfied, keep informed, or monitor.
Part of
Agile & Hybrid
Practice Sprint Review
Scenario-based questions with a full explanation on every answer — including why the distractors are wrong.