Nonverbal Communication

Nonverbal communication is the transmission of messages and meaning through wordless cues such as body language, facial expressions, gestures, posture, tone of voice, and eye contact.

Share:

Know it well enough for the exam? Questions on Nonverbal Communication are scenario-based, not definitional.

Practice it free

Explanation

Nonverbal communication accounts for a significant portion of the meaning conveyed in face-to-face interactions. Research suggests that the majority of emotional meaning in a message comes from nonverbal cues rather than the words themselves. For project managers, understanding and being aware of nonverbal signals is essential for effective communication, especially during negotiations, conflict resolution, and stakeholder engagement.

Types of nonverbal communication include kinesics (body movements, gestures, facial expressions), paralanguage (tone, pitch, pace, and volume of voice), proxemics (use of physical space and distance), haptics (touch), chronemics (use of time), and artifacts (clothing, environment, and objects). A project manager who crosses their arms during a meeting may unintentionally signal defensiveness, while one who maintains open posture and eye contact signals engagement and receptivity.

In multicultural project environments, nonverbal communication becomes particularly complex because gestures and spatial norms vary significantly across cultures. What is considered polite eye contact in one culture may be seen as aggressive in another. Project managers working with global teams must be sensitive to these differences and avoid assuming that their own nonverbal norms are universal. In virtual settings, nonverbal cues are limited, making it important to use video when possible and to compensate with explicit verbal communication.

Key Points

  • •Includes body language, facial expressions, tone of voice, gestures, and eye contact
  • •Carries a large portion of the emotional meaning in face-to-face communication
  • •Nonverbal cues vary significantly across cultures
  • •Limited in virtual environments, requiring more explicit verbal communication

Exam Tip

On the exam, remember that approximately 55% of communication is conveyed through body language, 38% through tone of voice, and only 7% through words. Nonverbal cues are the most impactful element of face-to-face communication.

Frequently Asked Questions

Related Topics

High-yield topics our learners drill most before exam day.

Burndown Chart

A burndown chart plots the work remaining (usually in story points) against time in a sprint or release, alongside an ideal line to zero, so the team can see each day whether it is on track to finish.

Burn-Up Chart

A burn-up chart plots completed work rising over time against a separate total-scope line, so progress and scope changes are visible independently; the work is finished when the two lines meet.

Resource Leveling

Resource leveling is a resource optimization technique that adjusts activity start and finish dates so that demand for a resource never exceeds its availability, accepting a longer schedule and a changed critical path if necessary.

Deliverables

A deliverable is any unique and verifiable product, result, or capability to perform a service that must be produced to complete a process, phase, or project, such as a software release, an audit report, or a trained support team.

Power Interest Grid (Power/Influence Grid)

The power interest grid is a 2x2 stakeholder mapping tool that plots each stakeholder by power (ability to affect the project) and interest (concern about its outcome) to decide how to engage them: manage closely, keep satisfied, keep informed, or monitor.

Critical Path Method (CPM)

The Critical Path Method (CPM) is a schedule network analysis technique that calculates early and late start and finish dates for every activity to find the longest path through the project, the minimum project duration, and the float on every other path.

Weighted Shortest Job First (WSJF)

Weighted Shortest Job First (WSJF) is a prioritization model, popularized by SAFe, that ranks work by cost of delay divided by job duration (usually estimated as job size), so the items that lose the most value per unit of time spent waiting are done first.

Risk Register

The risk register is a project document that records the details of individual project risks, including their identification, analysis results, response plans, and current status.

Stakeholder Mapping

Stakeholder mapping is the visual representation of stakeholder relationships, influence, interest, or other attributes using grids, matrices, or diagrams to support analysis and engagement planning.

Part of

Communications Management

Study full domain →

Practice Nonverbal Communication

Scenario-based questions with a full explanation on every answer — including why the distractors are wrong.